Skip to main content
VSI Technologies
Menu

Request a quote

Hardware, services, or both. Send a bill of materials for a line-by-line quote, or describe the requirement and we will scope it with you.

Brand, model or part number, one line per item. For example: Dell Latitude 5450, 16GB, 512GB SSD. A description works if you don't have a part number.

We use this only to reply with availability, lead time and price. See the privacy statement.

A bill of materials or a spec sheet. Up to 8MB.

Faster routes

If you already know the product, the storefronts are quicker than this form.

1-877-222-2369

Contact us

What we quote

What you can ask for

If it plugs in, racks, images or ships on a pallet, it is in scope. These are where most requests land.

Server, storage and network

Rack and tower servers, storage arrays, switching, firewalls, and the optics and cabling everyone forgets until commissioning day.

End-user devices at volume

Laptops, desktops, tablets and displays, quoted with imaging, enrolment and staged delivery rather than as a pallet arriving at a loading bay.

Apple product for business and education

Institutional Apple purchasing, including device enrolment and management, through the Apple channel.

Wireless and site infrastructure

Access points, controllers, structured cabling, and the survey that should precede all of it.

Software and licensing

Licence entitlements alongside the hardware, including the reconciliation nobody wants to discover at renewal.

Services around the hardware

Imaging, staging, installation, cutover support, decommissioning and certified disposal, quoted in the same exercise rather than found later.

How a quote gets faster

What helps, and why

None of these is required. Each one removes a round trip, and round trips are where the days go.

Information that shortens a quote
CriterionWhy it helps
Quantities and a delivery windowLead time is frequently the binding constraint. Knowing when you need it lets us say immediately whether the specification you asked for can arrive in time, or whether an alternative is the better answer.
Where it is goingOne address or forty changes the logistics, the staging and sometimes the price. Multi-site rollouts get quoted with a schedule rather than as a single shipment.
What it is replacingTells us the specification that has to be matched or exceeded, and opens the disposal conversation before it becomes an unbudgeted line at the end.
Whether you want servicesImaging, installation and cutover support are real cost and get discovered late when quoted separately. Including them makes the number comparable to what you will actually spend.
Public sector, and the vehiclePublic purchasing has quote-format and vehicle requirements that are cheaper to meet on the first pass than to redo.
A competing quote, if you have oneWe will tell you honestly where the other supplier is cheaper on the same line. That is more useful than a discount conversation, and it is the fastest way to find out whether we are competitive on your particular basket.

Volume and education

Buying for a fleet

Education institutions, government agencies and businesses buying at fleet scale get quoted differently from single-unit orders, different pricing, different lead times, and usually a staged delivery schedule tied to a term or a rollout. Say so in the form and it routes that way.

The part most often missed on a fleet order is what happens between the pallet arriving and the device reaching a person: imaging, enrolment, asset tagging, distribution and, at the end of the cycle, recovery. Those get quoted alongside the hardware because that is where the real cost and the real schedule risk sit, and because a term date does not move to accommodate a staging bottleneck.