Server, storage and network
Rack and tower servers, storage arrays, switching, firewalls, and the optics and cabling everyone forgets until commissioning day.
Procurement
Hardware, services, or both. Send a bill of materials for a line-by-line quote, or describe the requirement and we will scope it with you.
If you already know the product, the storefronts are quicker than this form.
1-877-222-2369
What we quote
If it plugs in, racks, images or ships on a pallet, it is in scope. These are where most requests land.
Rack and tower servers, storage arrays, switching, firewalls, and the optics and cabling everyone forgets until commissioning day.
Laptops, desktops, tablets and displays, quoted with imaging, enrolment and staged delivery rather than as a pallet arriving at a loading bay.
Institutional Apple purchasing, including device enrolment and management, through the Apple channel.
Access points, controllers, structured cabling, and the survey that should precede all of it.
Licence entitlements alongside the hardware, including the reconciliation nobody wants to discover at renewal.
Imaging, staging, installation, cutover support, decommissioning and certified disposal, quoted in the same exercise rather than found later.
How a quote gets faster
None of these is required. Each one removes a round trip, and round trips are where the days go.
| Criterion | Why it helps |
|---|---|
| Quantities and a delivery window | Lead time is frequently the binding constraint. Knowing when you need it lets us say immediately whether the specification you asked for can arrive in time, or whether an alternative is the better answer. |
| Where it is going | One address or forty changes the logistics, the staging and sometimes the price. Multi-site rollouts get quoted with a schedule rather than as a single shipment. |
| What it is replacing | Tells us the specification that has to be matched or exceeded, and opens the disposal conversation before it becomes an unbudgeted line at the end. |
| Whether you want services | Imaging, installation and cutover support are real cost and get discovered late when quoted separately. Including them makes the number comparable to what you will actually spend. |
| Public sector, and the vehicle | Public purchasing has quote-format and vehicle requirements that are cheaper to meet on the first pass than to redo. |
| A competing quote, if you have one | We will tell you honestly where the other supplier is cheaper on the same line. That is more useful than a discount conversation, and it is the fastest way to find out whether we are competitive on your particular basket. |
After you send it
Four steps. The one worth noting is the second, because most suppliers skip it.
Not an auto-responder with a ticket number. Where the requirement is clear, quoting starts immediately.
Where something is genuinely ambiguous you get a single specific question by email. Requesting a meeting to establish what you already wrote down is a sales process, not a quoting process.
Priced per line so you can see what you are paying for, with the lead time against each item and the overall delivery position stated. Where one line is the constraint, it is called out rather than buried.
Imaging, staging, installation, disposal, scoped against the same order rather than raised after you have committed to the hardware.
Volume and education
Education institutions, government agencies and businesses buying at fleet scale get quoted differently from single-unit orders, different pricing, different lead times, and usually a staged delivery schedule tied to a term or a rollout. Say so in the form and it routes that way.
The part most often missed on a fleet order is what happens between the pallet arriving and the device reaching a person: imaging, enrolment, asset tagging, distribution and, at the end of the cycle, recovery. Those get quoted alongside the hardware because that is where the real cost and the real schedule risk sit, and because a term date does not move to accommodate a staging bottleneck.
Questions